Our experienced construction team is integrated into the project from the initial development phase to improve planning, coordination and understanding of the project before construction. The field team is encouraged to think holistically as they are held responsible for construction processes, scheduling and quality of the delivery product.
Frequent site meetings are held as needed, involving all team members to ensure that everyone is committed to the project. The meetings focus mainly on the master project schedule evolution, quality of delivery, method statements, procedures and occupational health and safety on site.
Whether you're looking to build from scratch, renovate or extend, Apex Group DRC always aims to get the most out of every member involved in a project to ensure the only success is considered. This is the result of cautious planning, interaction, experience and respect.
For improved cost control, our Project Managers review and control the cost of construction based on required intervals with our client's representatives. Because Apex Group DRC takes transparency towards clients very seriously, a full cost reports is provided at each review meeting.
Apex Group DRC has a strong emphasis on quality control, and everyone is entitled to deliver quality at all time. All member of the team are responsable for understanding their accountability to achieving the highest standard of quality throughout the project life cycle.
Apex Group DRC displays safety measures and ensure their compliance in-situ. Our personnel conduct in-situ orientations, hazards and risk assessment for improved safety management. Constant safety inspection are held and our safety personnel has the responsibility to stop the work and remove staff if safety infringement are proven.
Apex Group DRC is committed to protecting the environment by reducing its carbon footprint, protecting the ecosystem and keeping the strict minimum waste production.